
5-5
SAFETY SAFETY
SAFETY SAFETY
SAFETY
ANAN
ANAN
AN
ALAL
ALAL
AL
YZER--MANUYZER--MANU
YZER--MANUYZER--MANU
YZER--MANU
AL MODEAL MODE
AL MODEAL MODE
AL MODE
STEP 2
9
Line Status
The first step in the test process is to analyze the line
status. This is done automatically, from the moment the
analyzer is plugged in and the line LEDs give a continuous
indication of the line status. Two green LEDs are
necessary for testing; if not, the user will see an alarm (See
ALARMS for details) on an attempt to run a test.
RUNNING A MANUAL TEST
NOTES:
CCAUTION: If a printer is connected
to the unit and the two are plugged
into separate outlets, the system
cannot detect an invalid ground on
the outlet the unit is plugged into if
the printer is plugged into a valid
outlet.
CTable Key:
= Green LED
= LED Off
= Red LED
Wiring
Correct
Polarity
Reversed
Ground
Opened
Hot
Opened
Komentáře k této Příručce